Campground Facility Washroom

This job was a new building that had an epoxy floor installed one year prior (not by Strong Bond) that failed. The coating had to be completely removed from floor and cove base, extensive prep required on floors and wall base before installing our Hybri-Flex EQ System and 4" integral cove [...]

Community Club

This project was an outdoor pool deck repair and resurface. Extensive prep, and grinding, was required as well as patching and repair. System used was Polycrete SLB with custom colour Accelera top coat.

Go to Top