Project Description

Meteghan Fire Department

This was a large apparatus bay job that required detailed prep prior to our SB Epoxy Flake System installation and a very detailed logo application, as well as some Safety/Parking lines.

Tell us About Your Project
Give Us a call
20170529 15530720170602 164746

Customer Projects

Amherst Fire Department

This was a 5,000 square foot apparatus bay job that required floor prep and some repair before installing

Meteghan Fire Department

The fire station in Meteghan Nova Scotia needed a durable epoxy solution with safety lines and added their logo