Project Description

Little Harbour Fire Department

The This job involved the apparatus bays, washroom, and community room in the Little Harbour Fire Hall.

Tile and mastic removal were required in most areas prior to prep and final coating of our SB Flake System.

Tell us About Your Project
Give Us a call

Customer Projects

Amherst Fire Department

This was a 5,000 square foot apparatus bay job that required floor prep and some repair before installing

Meteghan Fire Department

The fire station in Meteghan Nova Scotia needed a durable epoxy solution with safety lines and added their logo